EXCAVATION BEGINS

 
Old drive cut in half for new

Trackhoe starting from access road below

The old drive being cut in half for the new

Trackhoe working his way up the hill

 

Trackhoe cutting upper drive

Trackhoe starting to excavate for house site

 

Trackhoe digging out rock for house foundation

Backhoe hammering out solid rock

The HAMMER chipping away for the house foundation

Backhoe & Trackhoe in background below

Athena's Zuki trying out the new graded drive

The parking area under the cabin

The "new" enterance

Xavier finishing up footer

Wire mesh and rebar set for the parking area

Footer for retaining wall

Conduit & water & septic from under the driveway

Forms are down with the wire mesh in place

This is under the cabin window

This is not a break, waiting for the concrete to come out of the pipe !

Really they know what they are doing

Sammy the "Boss" showing how it is done

Half way down and still going (10 trucks, 80 cubic yards of concrete in all)

Our Great Crew !
We started the forming for the 90' retaining wall July

The Finished Driveway with forms for wall

The Back of Forms for Wall

The Forms with rebar in place

The Formed Wall

Detail of Finished Forms

Carport  (roof to come)

Carport

Carport & New Wall above

Back of Finished Retaining Wall

Retaining Wall

Old Driveway Entrance (next to the new one)

Wastewater Treatment Plant Location

 

Grey Water Plant Location (we are capturing the rainwater running down the driveway)

Athena's Bougainville along the downhill side of the drive

Site for Cottage (top center)

Finished Retaining Wall along Driveway

 Our Main Enterance

Site for House